October 24, 2007

Site Clearing- Day 3


Click to enlarge.

It is day 3 of the site clearing. Everything that needed to go has gone and the site is being leveled with a swale running along one side of the house closest to the neighbor. The house corners have been pegged (not yet officially) and it seems massive but then when we picture the room walls within it doesn't feel that big at all. It is basically two pods. The main part of the house is the rectangle which is 1600 sf. The square pod is 400 sf. It is marked as storage but we will finish it later into a guest suite/3rd bedroom. I'll have freedom and more knowledge to try to incorporate some of the features of the prefabs and green homes I admire. I'd like to try to keep the square pod off the grid even though it will be connected to the main space through a shared doorway. Haven't quite thought that one through yet. Basically it would have its own water and power sources set up. I want to be able to try some of these systems on a small scale.